Haleiwa, Hawaii:
"Here are over 100 pictures of 2 homes we recently designed, engineered, fabricated, and framed on the North Shore of Oahu, Hawaii! When finished, each of these homes will be worth approximately $1,300,000.00."
 
 
"Here is the slab for house #1."
 
 
"Here is the slab for house #2."
 
 
"The steel has arrived and is ready to be unloaded!"
 
 
"It was a tight fit to get the steel for both homes on the site."
 
 
"Unloading more steel . . ."
 
 
"It was tight . . . but we were able to make it work! All the steel is unloaded and ready to be framed."
 
 
"Here you can see both slabs . . . one is behind the other . . . and they are both square, level, and ready to be framed upon."
 
 
"The first walls are framed and stood up in place!"
 
 
"All of the exterior walls on the first home first floor are framed and up . . . now to start the walls on the second home first floor."
 
 
"The walls are going up . . ."
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"Now the exterior walls for the first floors of both homes are framed and stood."
 
 
"Framing of the second floor system begins."
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"Here both floor systems have been completely framed and are now ready to have the floor sheathing installed to them."
 
 
"Here the floor decking of the first house is complete and almost complete on the second house. (No, that is not a middle finger. LOL.)"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"Another rainbow over the job site!"
 
 
"After completing the floor decking of both homes, the material for the 2nd floor exterior wall framing and roof truss fabrication is brought up and organized."
 
 
"-"
 
 
"Since the floor decking of the second floor offers a nice flat surface, a jig of each roof truss is created on the floor decking and each roof truss for each home is fabricated in it."
 
 
"-"
 
 
"Here, one of the jigs is complete and ready to build roof trusses in it!"
 
 
"Here are a few of the roof trusses made in the jig shown above."
 
 
"-"
 
 
"-"
 
 
"As the roof trusses are built they are removed from the roof and stacked elsewhere on the jobsite until they are installed."
 
 
"Ropes are tied to each truss and they are carefully lowered down to the ground."
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"Once on the ground the trusses are carried and stacked into piles until they are installed."
 
 
"-"
 
 
"-"
 
 
"The stacks of trusses get higher and higher as construction goes on."
 
 
"As the truss fabrication continues, walls on the second floor of the other home are framed and stood. Here the first wall is up."
 
 
"The second wall is going up . . ."
 
 
"Here the walls on the second floor of the other home are nearly complete and ready for trusses."
 
 
"The last of the roof trusses to be built are the girder and hip rafter trusses. In these roof designs, these trusses are carrying a large amount of the roof load so they are really heavy duty. In fact, each of these trusses weighs about 475 lbs.!"
 
 
"It seems as though our pot of gold is 'silver'!"
 
 
"The second floor exterior walls are all up on both homes and are now ready to have the roof trusses installed on them."
 
 
"The first truss is set!"
 
 
"Here, one of the heavy hip rafters is being installed."
 
 
"The roof plane is now taking shape. . ."
 
 
"Now to install the roof trusses on the other home."
 
 
"Another view of the roof plane on the first home to have the trusses installed."
 
 
"The roof truss installation on is now nearly complete."
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"The ceilings throughout each of the homes are vaulted. Here you can see what the ceilings are going to look like when finished. The horizontal cross piece near the peak of the ceiling on each truss is just a temporary support for stability while installation. It is removed later."
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"Now the roof decking can be installed."
 
 
"-"
 
 
"-"
 
 
"Now the wall sheathing is installed . . ."
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"Here you can see multiple things are occurring at the same time. As the wall sheathing is being completed, Tyvek house wrap is being installed and the exterior wood siding is being installed as well. The siding, trim, roof shingles, soffit materials, etc. were all imported for this project from Indonesia!"
 
 
"Also, the roof shingles are starting to be installed."
 
 
"-"
 
 
"-"
 
 
"The roof being shingled."
 
 
"-"
 
 
"-"
 
 
"Here is a finished hip corner ... gorgeous!"
 
 
"-"
 
 
"Here . . . the finished roof."
 
 
"-"
 
 
"And now . . . more siding and deck installation."
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"-"
 
 
"As you can see here,Batan, also imported from Indonesia, is being used as the soffit material."
 
 
"Nearly complete . . ."
 
 
"-"
 
 
"This picture shows the exterior finished product . . . the decking materials and ornamentation, the batan soffit, and the iron wood shingles all installed."
 
 
"Here the homes are nearly complete. We will add more photos of the finished home to this site as they become available."
 
 
"-"